Case Study · Commercial Water Damage Restoration
Burst Riser Above an Imaging Suite
Colorado Medical Office · Fort Collins, CO
50 min
Initial response
7 days
Suite back in service
$0
Equipment loss
The Situation
A second-floor riser failed during a January cold snap and discharged into the ceiling above the ground-floor imaging suite. Equipment value below the loss was substantial, and the suite was scheduled for clinic appointments the next morning.
Our Approach
- 01
On-site within 50 minutes; immediate water extraction and equipment protection.
- 02
Negative-pressure containment around the imaging suite to maintain ICRA-aware air management.
- 03
Coordinated with the carrier and imaging-equipment OEM on dry-down and clearance criteria.
- 04
Phased construction overnight and on weekends to keep the rest of the clinic on schedule.
The Result
Suite returned to full clinical operation seven days after the loss, with documented air clearance and equipment OEM sign-off. No appointments cancelled outside the immediate impact window.