Case Study · Commercial Water Damage Restoration
Sprinkler Discharge in a Distribution Warehouse
Wyoming Distribution Center · Cheyenne, WY
rapid
Initial response
4 days
Aisles re-opened
0
Missed shipments
The Situation
An overnight sprinkler head failure during a freeze event released several thousand gallons across three aisles of food-grade palletized inventory. Production had a same-week ship deadline.
Our Approach
- 01
Zone containment around the affected aisles so the rest of the warehouse kept shipping.
- 02
Pallet-by-pallet inventory triage with the on-site quality team.
- 03
Structural drying with monitored moisture mapping; coordinated with the racking OEM on integrity.
- 04
Documented every step for the carrier with daily moisture logs and photographs.
The Result
Affected aisles re-opened in four days. Salvageable inventory recovered above the carrier's threshold; balance documented for claim. No impact to the same-week ship deadline.
24/7 Response
Have a Loss Like This One?
rapid 24-hour response across Colorado, Wyoming, and Florida.
